Read Full Story — Construction
A firm carrying out earthworks (cut and fill) on road and infrastructure projects operated its equipment using traditional, operator-experience-based methods.
Measurement errors in cut-and-fill work led both to excess material use and to some sections needing to be redone. It was technically well understood that GPS-controlled equipment would significantly reduce these errors; but experienced operators resisted the change, worried the system would make their own expertise redundant.
A pressure-free learning process shared the gain early:
The system was piloted on two excavators at the single site with the most frequent errors; this kept risk and learning burden limited.
Material-savings figures from the first weeks were shared directly with the pilot operators; this showed the system was making their job easier, not replacing them.
Hands-on training time was set aside for operators to learn the system during hours free of production pressure.
After seven months, excess material at the pilot site dropped significantly. The system was adopted even by initially the most resistant operators and rolled out to other sites without friction.
Resistance to technological change in field equipment usually stems not from the technology itself but from a will this make me redundant worry. Sharing the gain early and concretely is the fastest way to reduce that worry.
Share this content:
Comments (0)
No comments yet. Be the first to write one.